pwe3-2----Page:4
1  2  3  4  5  6  7  8  9  10  11 

General Re-organization
IANA allocations:
Control Document contains only required new allocations from existing IANA registries.
All new IANA registries and initial allocations are moved in the IANA document.
Service Specific text:
All PW service specific text has moved from the control draft into it's respective encapsulation drafts.
Interface Parameters specific to a technology have moved to the appropriate technology draft.
All text referring to IP/L2TPV3 has been removed.
PPT Version