pwe3-4----Page:14
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15 

OAM Requirements
MS-PW OAM SHOULD be supported end-to-end across the network

OAM activation/deactivation SHOULD be tied to MS-PW setup/tear down

The MS-PW SHOULD support a Forward Defect Indicator (FDI)

Single ended monitoring SHOULD be supported for both directions of the MS-PW

MS-PW OAM SHOULD support switch over between 1:1 protected LSPs end-to-end

End-end and segment-based In-band monitoring SHOULD be provided

At the S-PE, defect notifications on the upstream segment of PWs must be propagated to the downstream PW segment

All PE routers along the MS-PW MUST agree on a common PW OAM mechanism

At the S-PE, defects on an PSN tunnel must be propagated to all PWs that utilize that particular PSN tunnel
The directionality of defect notifications must be maintained across the S-PE

The S-PE should be able to behave as a segment endpoint for PW OAM mechanisms

The S-PE MUST be able to pass U-PE to U-PE PW OAM messages transparently
PPT Version