I was asked to do a QA review of draft-ietf-idr-te-pm-bgp-03 This is a short, simple, well written draft that integrates two existing technologies. It is ready to move onto its next stage. The only (minor) observation that I would make, is that the front page author list is longer than is normally acceptable by the IESG. Assuming that all the TLVs that are needed are included, the draft looks about finished. - Stewart