dtnrg-6----Page:8
1  2  3  4  5  6  7  8  9  10  11 

Visibility -> Comms. Schedule
Various algorithms possible
Minimal: Attempt to ensure that each node gets a chance to talk to at least one mule during a given schedule period
Filled: As above but iterate to try to “fill-in” all gaps until no change or configured limit reached (this is the default)
Could envisage others too, e.g.
Giving configured weights to nodes, or more interestingly basing such weights on actual measured network stats
Various random schemes
PPT Version