
|
Draft Status – Still with the Working Group Two drafts being marked up after WG last call LMP Transport Loose path re-optimization Eight drafts ready for WG last call Will issue last call after Minneapolis Three MIB drafts Three inter-domain drafts Two protection signaling drafts Three WG drafts in progress RSVP-TE Graceful Restart (minor edits needed) Inter-domain RSVP-TE (needs to be seasoned) ASON Signaling Extensions (some work needed) One draft dormant? Tunneling protocol (no-one interested in implementing) |