ccamp-2----Page:3
1  2  3  4  5 

ITU-T SG15 Activities
Signaling
Q14 appreciates the CCAMP clarifications regarding crankback
Crankback will be incorporated into the call model
The CCAMP clarification will be used to develop protocol requirements for the next revision of G.7713 (“Distributed call and connection management”)
G.7713 Revision is planned for May 2005 consent
After that, the protocol details from can be incorporated into G.7713.2.
Routing
Continue to seek for protocol-specific routing solutions for ASON
Discovery
Continue to work on G.7714 Revision
As a result of the discussion of terminology, suggestion made to CCAMP to provide some additional context into that will aid the members of the IETF in understanding the terminology used by the ITU-T (e.g., SNPP Link vs TE link, and Node)
PPT Version