pce-2----Page:8
1  2  3  4  5  6  7  8  9  10 

Detailed requirements 3/3
PCE Discovery Information Synchronization
Detect any change in PCE capabilities
Detect a new PCE
Time scale for such detection : Within 60s

A specific PCE selection algorithm should be defined
Ensure consistency in computation load balancing behavior
Detailed requirements are beyond the scope of this doc

Scalability with an increase of :
Number of PCCs
Number of PCEs
Number of IGP areas in the discovery scope
Number of ASs in the discovery scope

PPT Version