
|
Detailed requirements 3/3 PCE Discovery Information Synchronization Detect any change in PCE capabilities Detect a new PCE Time scale for such detection : Within 60s A specific PCE selection algorithm should be defined Ensure consistency in computation load balancing behavior Detailed requirements are beyond the scope of this doc Scalability with an increase of : Number of PCCs Number of PCEs Number of IGP areas in the discovery scope Number of ASs in the discovery scope |