adslmib-3----Page:20
1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27 

adsl2PMLineInitTable
The “current” part of the “ATU Line Performance” table (5.3.1) in TR-90 that refers to the whole line
15 minutes current interval
Full Initializations
Failed Full Initializations
Short Initializations
Failed Short Initializations
24 hours current interval (same structure)
PPT Version