rtgwg-0----Page:5
1
2
3
4
5
6
7
8
9
10
Micro-loop prevent DT report
Methods:
Incremental cost changes
Sync’ed FIB installation
Path locking via safe neighbors (PLSN)
Ordered FIB installation (OFIB)
Tunnel-based
Combination of PLSN with OFIB or tunnels
PPT Version