rtgwg-0----Page:8
1  2  3  4  5  6  7  8  9  10 

DT: Ordered FIB install
Pros:
100% coverage, including asymmetric link costs
SRLGs supported, may require per-group timers
Completely control-plane based
Cons:
Worst case convergence time can be long
May become greater than current convergence times
Increases risk of second topo event
Can be improved with signaling

PPT Version