
|
Steps in the WG process WG Last Call Final check that the WG has rough consensus to advance the document to the IESG WG consensus indicates that the WG believes that this document is both technically sound and useful, and ready to go to the IESG Process BCPs do not require WG Last Call It is a good idea, however A disturbingly large number of people wait until WGLC to read drafts! |